NRM 1 - Order of Cost Estimating and Cost Planning for Capital Building Works: NRM 1 (New Rules of Measurement)

£9.9
FREE Shipping

NRM 1 - Order of Cost Estimating and Cost Planning for Capital Building Works: NRM 1 (New Rules of Measurement)

NRM 1 - Order of Cost Estimating and Cost Planning for Capital Building Works: NRM 1 (New Rules of Measurement)

RRP: £99
Price: £9.9
£9.9 FREE Shipping

In stock

We accept the following payment methods

Description

Save where and to the extent expressly permitted within this document, no par t of this work may be reproduced or used in any form or by any means including graphic, electronic, or mechanical, including photocopying, recordi ng, taping or web distribution, without the writ ten permission of RICS or in line with the rules of an existing licence.

There might have been a network issue: ensure that your connectivity is stable and try to reload the page to see if it solves the issue.Worked examples, flow charts, diagrams, templates and check lists ensure readers of all levels will become confident and competent in the use of NRM1. In the NRM1 Cost Management Handbook, David Benge explains in clear terms how NRM1 is meant to be used in familiar quantity surveying tasks, as well as a range of activities of crucial importance for professionals in years to come.

These rules are supported by the BCIS (Building Cost Information Service) ‘Elemental Standard Form of Cost Analysis, (NRM) Edition’, which sets out the principles of analysing building costs.One of the other great things about NRM1 is that the rules can be used as a basis for capturing historical cost data and completing the ‘cost management cycle’ to help with benchmark analysis of future projects. Sam Birch, Jo FitzLeverton, Megan Reed and Jess Rogers RICS and the NRM authors would like to acknowledge the eorts of the original steering group, chaired by Stuart Earl: Ed Badke, David Benge, Alan Cripps, John Davidson, Andy Green, Joe Martin, Sean Smylie and Roy Stratton. In the NRM1 Cost Management Handbook , David Benge explains in clear terms how NRM1 is meant to be used in familiar quantity surveying tasks, as well as a range of activities of crucial importance for professionals in years to come.

It provides in depth guidance on the quantification of building works for the purpose of preparing cost estimates and cost plans.

in addition it was thought that the SMM7 was too UK centric and a more universal approach was now required. e. preliminaries, overheads and profit, project team and design team fees, risk allowances, inflation, and other development and project costs. There is a section on risk and how bills of quantities should be codified and in addition there is a typical example of a structure for use when procurement is based on work packages instead of bills of quantities. Allowing better consideration of the full costs of a construction project (for example, marketing costs, fees and charges, the cost of acquiring land, planning costs, relocation costs, the cost of finance and so on).

These translations have not been published by NBS as part of Uniclass, but if you have prepared a translation or are interested in doing so, we would be happy to hear from you. It became operative on 1 January 2013 and replaced the Standard Method of Measurement, seventh edition ( SMM7) on 1 July 2013. Direction on how to quantify other items forming part of the cost of a construction project, that many may not thinkabout is also provided such as: preliminaries, overheads and profit, project team and design team fees, risk allowances, inflation, and other development and project costs. They provide a standard set of measurement rules for estimating, cost planning, procurement and whole-life costing for construction projects.While NRM is based on UK practice, it provides a framework for a common set of rules and guidance with global application. The Royal Institute of Chartered Surveyors (RICS) have developed and published a suit of documents titled the New Rules of Measurement (NRM). Most purchases from business sellers are protected by the Consumer Contract Regulations 2013 which give you the right to cancel the purchase within 14 days after the day you receive the item.



  • Fruugo ID: 258392218-563234582
  • EAN: 764486781913
  • Sold by: Fruugo

Delivery & Returns

Fruugo

Address: UK
All products: Visit Fruugo Shop